![]() ![]() The seams dip at approximately seven-eight degrees. The coal occurs as two seams (P1 and P2) which strike east-west for approximately 10 kilometres before trending for a further 10 kilometers to the north. A total of 218 open holes and 37 cored holes were drilled at an average depth of approximately 110 meters for a total meterage of approximately 24,000m. The 2008 drilling program was designed to deliver a resource on which a feasibility study can be performed. On its website Rey Resources states that "earlier drilling by Premier Mining in the 1970s reported coal in the area and Rey Resources is testing the concept that the coal is present in sufficient quantities to support an export thermal coal operation. In March 2013 Rey Resources announced that, in return for an investment of $3.03 million by the Hong Kong "investment company" Crystal Yield Investments, "been granted exclusivity for 3 months to complete due diligence investigations on the Duchess Paradise coal project, with a view to financing future development of the project." The company then proposes that the barges be towed approximately 12 nautical miles to an existing vessel mooring point in King Sound. The company proposes that coal be loaded from a stockpile via a conveyor to a barge loader and then to barges capable of carrying 8,500 tonnes each. Rey Resources has proposed that coal be trucked approximately 140 kilometres from the mine to the Derby Export Facility, a mothballed lead and zinc exports jetty. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |